ISO 3834 Welding Quality Management

Contact us for a quote

Technoweld gets fabricators ready for ISO 3834 certification and helps them hold it. We start with a fixed-scope gap analysis against the part your work needs, then supply the documentation or a complete welding management system, support your welding coordination, run a pre-audit before the certification body arrives, and train your people to run it.

Call 1300 00 WELD or request a quote.

What ISO 3834 asks of a fabricator

AS/NZS ISO 3834 sets the quality requirements for fusion welding, in the workshop and on site. Part 2 is comprehensive, Part 3 standard and Part 4 elementary. The part you need depends on the work, your client’s specification and, for structural steel, the AS/NZS 5131 construction category. The current Australian edition of Part 2 is AS/NZS ISO 3834.2:2023, an identical adoption of ISO 3834-2:2021.

ISO 9001 calls welding a special process and leaves it there. ISO 3834 sets out what controlling it takes: contract and technical review, qualified procedures and welders, competent welding coordination, controlled materials and consumables, calibrated equipment, inspection before, during and after welding, traceability and records.

Our ISO 3834 explainer covers the parts and the certification process in more detail.

What we do

  • Gap analysis: a fixed-scope review of your current system and workshop practice against the part of ISO 3834 you need, with a written list of what is missing and what to do first
  • Documentation: procedures, forms and registers written to fit how your workshop already works
  • A complete welding management system: technical review, subcontracting, welding coordination, procurement, materials and consumables, welding control, weld mapping, inspection, calibration, traceability, nonconformance and records, ready to adopt
  • Welding coordinator support: setting up welding coordination to ISO 14731 and supporting your coordinator in the role
  • Pre-audit: an audit run the way the certification body will run it, so the findings come from us first
  • Training: for coordinators, supervisors, inspectors and welders on running the system day to day
  • WPS and welder qualification: procedures from our library of more than 3,250 qualified WPSs, and welder qualification tests witnessed under our NATA accreditation. See our welding procedure service.

Who issues the certificate

Certification is issued by an independent certification body, not by us. We prepare you for that audit, close out what it finds, and help you hold the certificate through surveillance audits.

What you get

  • A gap analysis report against the part of ISO 3834 you need
  • System documents in Word, yours to adopt and change
  • Registers for materials, consumables, WPSs and welder qualifications
  • A pre-audit report with each finding and how to close it
  • Training records for the people who run the system

What our welding management system covers

The system follows a job from technical review to the manufacturer’s data report. Every procedure, form and register is mapped to the clause of ISO 3834-2 it answers. Tap a card to see when it is used.

ProcedureForm or referenceRegisterTap a card for when it is used
1
Contract and Technical Review
Review requirements at tender and award, confirm the ISO 3834 part, standards and project controls
PRO-3834-001ISO 3834-2 cl 5.2, 5.3
Welding and Associated Processes Technical Review

Defines project requirements before fabrication starts, at tender and again after award.

Completed before fabrication starts, preferably at tender and post award. Signing the Technical Review Form by the General Manager, Production Manager or workshop leading hand constitutes approval.
3834-001-FISO 3834-2 cl 5
Welding and Associated Processes Technical Review Form

The working form that records the outcome of the technical review.

Filled out during the technical review for each project.
3834-001-F-PEISO 3834-2 cl 5
Pressure Equipment Technical Review Form

Technical review form for pressure equipment work.

Used in place of 3834-001-F where the job is pressure equipment: AS/NZS 1200, AS 4458, AS 4037, ASME BPVC and ASME B31.
PRO-3834-022ISO 3834-2 cl 5.3
Technical Query and Dispensation

Separates a technical query from a dispensation and controls how each is raised and approved.

Pre award, post award and during fabrication. Prepared by the WC1 or RWC and signed before submission to the client.
2
Subcontracting
Select, approve and watch the subcontractors who weld, coat or test for you
PRO-3834-021ISO 3834-2 cl 6
Managing Subcontractors

Controls how subcontractors are selected, approved and managed.

Before engaging a subcontractor, the technical review sets the requirements for the outsourced scope and confirms the subcontractor can meet the contractual quality, timeline and budget requirements.
3834-006-FISO 3834-2 cl 6
Subcontractor Audit

Audit form for assessing a subcontractor before approval.

Used before a new subcontractor is approved.
3834-021-FISO 3834-2 cl 6
Subcontractor Surveillance QA

Records surveillance of a subcontractor's work while the job runs.

Used during the subcontracted scope.
3
Welding Personnel and Coordination
Coordination roles, welder qualification and the registers that prove it
PRO-3834-010ISO 3834-2 cl 7.3
Welding Coordination

Defines the welding coordination roles, their responsibilities and the qualifications or competence each needs.

Four levels of welding coordinator, with roles and responsibilities set by risk. Ultimate responsibility sits with the responsible welding coordinator (RWC).
Weld Co-ord MatrixISO 3834-2 cl 7.3
Welding Co-ordination Matrix

Reference matrix of coordination tasks against the coordinator levels.

Supports PRO-3834-010 when roles are assigned.
PRO-3834-006ISO 3834-2 cl 7.2
Welder Qualification Procedure

Method for witnessing welder and welding operator qualification tests and checking the final document.

Before a welder starts production welding on a procedure they are not yet qualified for.
3834-023-FISO 3834-2 cl 7.2
WQT Register

Register of welder qualifications and their status.

Updated as welders are qualified and as qualifications are confirmed or lapse.
4
Procurement and Material Control
Buy, receive, store and trace parent material and consumables
PRO-3834-004ISO 3834-2 cl 5, 11, 12
Procurement of Material

Makes sure purchased materials meet the quality and traceability requirements of the product standard, and only authorised purchases are made.

Applies to materials, components and services that go directly into the product.
PRO-3834-007ISO 3834-2 cl 12
Incoming Inspection and Storage of Steel

Incoming inspection of steel for production.

Every delivery must come with its material certificates and delivery docket; certificates are filed against the job.
PRO-3834-008ISO 3834-2 cl 17
Material Traceability

Maintains traceability of material used in production, from stock length to finished item.

Applied when the client requires it, starting from material received and stored under PRO-3834-007.
PRO-3834-009ISO 3834-2 cl 11
Welding Consumables Control

Controls purchase, storage, issue and use of welding consumables.

Controlled consumables are bought from approved suppliers under PRO-3834-004 and must be made to the relevant consumable standard.
3834-011-FISO 3834-2 cl 12
Materials Checklist

Checklist used when material is received.

Completed at goods receipt.
3834-009-FISO 3834-2 cl 17
Material Register

Register of material received, its certificates and identification.

Updated on every receipt.
3834-010-FISO 3834-2 cl 11
Consumable Register

Register of welding consumables received and used.

Updated when consumables are received and issued.
Ribbon System ColoursISO 3834-2 cl 17
Ribbon System Colours

Reference for the colour coding used to identify material.

Used with PRO-3834-008.
5
Production Planning and Welding Procedures
Work packs, qualified procedures, ITPs and weld maps before the first arc
PRO-3834-003ISO 3834-2 cl 10.1, 10.4
Work Pack

Requires a work pack for every workshop and site project.

Extent set by client requirements, construction category and the ISO 3834 quality requirements.
3834-007-FISO 3834-2 cl 10.1, 10.4
Work Pack Template

Template used to assemble each work pack.

Populated for each project or scope.
PRO-3834-005ISO 3834-2 cl 10.2, 10.3
Welding Qualification

Guidance on qualifying welding procedures and personnel.

A pWPS is developed by the RWC and a capable welder completes the test coupon where the client requires a PQR.
3834-022-FISO 3834-2 cl 10.2
WPS Register

Register of qualified WPSs and their status.

Updated as procedures are qualified or withdrawn.
PRO-3834-014ISO 3834-2 cl 17
Weld Mapping

Identifies each weld so the WPS used, the welder and the visual and NDE results can be traced.

Before welding, on drawings for jobs that need weld traceability.
3834-003-FISO 3834-2 cl 14.1
ITP Structural, ISO 3834-2

Inspection and test plan for structural fabrication to ISO 3834-2 comprehensive requirements.

Developed at project set-up under PRO-3834-011 and agreed with the client, where the job is to ISO 3834-2.
3834-004-FISO 3834-2 cl 14.1
ITP Structural, ISO 3834-3

Inspection and test plan for structural fabrication to ISO 3834-3 standard requirements.

Used in place of 3834-003-F where the job is to ISO 3834-3.
6
Fabrication and Welding
Cutting, assembly, welding control and the checks before and during welding
PRO-3834-013ISO 3834-2 cl 10
Fabrication

Cutting, shaping, holing, bending and assembly of structural steel.

Throughout fabrication. Steel to be painted or galvanised must also comply with PRO-3834-017.
PRO-3834-012ISO 3834-2 cl 10, 14.2, 14.3
Welding Control

How welding requirements are identified, controlled and documented.

A visual inspection is made by the WC1 or WC2 after fit up and assembly, then welding is monitored against the WPS.
3834-012-FISO 3834-2 cl 14.2, 14.4
Dimensions Checklist

Records dimensional checks against the drawings.

Before and after welding.
3834-013-FISO 3834-2 cl 14.2
Pre Welding Inspection Checklist

Checks completed before welding starts.

Before welding.
3834-014-FISO 3834-2 cl 14.3
During Welding Checklist

Checks completed while welding is in progress.

During welding.
3834-008-FISO 3834-2 cl 14.5
QA Stamp

Stamp on workshop drawings to record progressive sign-offs.

On each drawing through the shop.
PRO-3834-024ISO 3834-2 cl 14.5
Inspection and Test Status

Shows the inspection status of each joint on the job.

A traceability box is applied to each joint as it is fitted up, under an ITP developed with PRO-3834-011.
7
Inspection, Testing and Nonconformance
Visual inspection, NDT, release and control of anything that fails
PRO-3834-011ISO 3834-2 cl 14
Inspection and Testing

In-process and final inspection and testing, excluding incoming inspection.

The type and extent of inspection suit the material and joint, set out in an ITP.
PRO-3834-015ISO 3834-2 cl 8, 14.4
Inspection of Welds

Visual inspection method and acceptance requirements for structural welds.

To AS 3978 and AS/NZS 1554.1.
3834-015-FISO 3834-2 cl 14.4
Visual Inspection After Welding Checklist

Records the visual inspection of completed welds.

After welding.
3834-016-FISO 3834-2 cl 14.4, 17
Traceability and NDT Request

Requests NDT and records the weld and NDT traceability.

For welds that need NDT or traceability.
PRO-3834-020ISO 3834-2 cl 15
Control of Nonconformances

Separates and controls nonconforming product and records system nonconformances.

Whenever a nonconformance is found, at any stage.
3834-020-FISO 3834-2 cl 15
Non-Conformance Report

Records a nonconformance, its disposition and close-out.

Raised under PRO-3834-020.
8
Coating, Fastening and Dispatch
Surface treatment, bolting and release from the workshop
PRO-3834-017ISO 3834-2 cl 6, 14
Control of Coating

Surface preparation and corrosion protection, including painting and galvanising.

All coating is outsourced through approved subcontractors. The coating specification may add requirements.
3834-005-FISO 3834-2 cl 14.1
ITP Coating

Inspection and test plan for coating.

Agreed before coating starts.
PRO-3834-019ISO 3834-2 cl 10
Fastening

Requirements for fastening to AS 4100 and AS/NZS 1554.1.

Where the scope includes bolting.
3834-019-FISO 3834-2 cl 10, 18
Bolting Record

Records bolting and tensioning.

For each bolted connection in scope.
3834-017-FISO 3834-2 cl 14.4
Dispatch Checklist

Final checks before items leave the workshop.

Before dispatch.
9
Quality Records
The manufacturer's data report the client receives
PRO-3834-002ISO 3834-2 cl 18
Manufacturer Data Report

Sets the requirement and format of the MDR.

Built as the job runs, as required by the regulator, the code of construction and the contract or ITP. The technical review sets what goes in.
3834-002-FISO 3834-2 cl 18
MDR Index

Contents list of the MDR.

At project completion.
10
Equipment
Maintenance, calibration and validation, ongoing through every phase
PRO-3834-016ISO 3834-2 cl 9.5
Welding Machine Maintenance

Maintenance of welding machines.

To the manufacturer's maintenance guidelines, which take precedence in a conflict. All maintenance is logged.
PRO-3834-023ISO 3834-2 cl 16
Calibration and Validation of Welding Machines

Calibration and validation of welding machines to ISO 17662 and IEC 60974-14.

Only machines with a digital read-out can be validated. Measurements use a calibrated device and must fall within the 2.5% allowance.
QMS 3834 Document RegisterISO 3834-2 cl 18
QMS 3834 Document Register

Master list of the documents in the system.

Updated whenever a document is added or revised.

Questions fabricators ask

Which part of ISO 3834 do we need?

It depends on your client’s specification and the product standard. For structural steel, AS/NZS 5131 links the part to the construction category. We confirm it in the gap analysis.

Do you issue the ISO 3834 certificate?

No. Certification is issued by an independent certification body. We get you ready for its audit and help you keep the certificate.

We already hold ISO 9001. Do we still need ISO 3834?

If your clients or your standard ask for it, yes. ISO 9001 does not set welding requirements. ISO 3834 can sit inside your ISO 9001 system, so contract review, purchasing and records are shared rather than duplicated.

Do we need a welding coordinator?

Yes. ISO 3834 requires welding coordination personnel, and ISO 14731 sets out their tasks, responsibilities and competence. We help you set the role up and support the person in it.

How long does it take?

It depends on where you start. The gap analysis tells you, in writing, what is missing and how much work it is.

Can you supply the WPSs and welder qualifications as well?

Yes. Most procedures come from our library of more than 3,250 qualified WPSs, and welder qualification tests are witnessed under our NATA ISO/IEC 17020 accreditation.

Get your welding system audit-ready

Tell us what you fabricate, the standard or specification you work to and whether you hold ISO 9001, and we will scope the gap analysis.

Call 1300 00 WELD or request a quote.