Welding Procedure Specifications (WPS and PQR)
Contact us for a quoteTechnoweld writes, qualifies and signs off welding procedures for fabricators, builders and asset owners across Australia. Most WPSs come from our library of more than 3,250 qualified procedures, typically within 24 hours. New procedures are welded, witnessed and tested in 3 to 5 business days. You get the WPS, the PQR, test reports, material certificates and a WPS register.
Who signs off, and who witnesses
Every WPS we supply is reviewed and signed off by our International Welding Engineer (IWE) before it is issued. The manufacturer approval stays with you, because AS/NZS 1554.1 makes the fabricator responsible for establishing its procedures.
Procedure qualification tests are witnessed under our NATA accreditation as a Type A inspection body to ISO/IEC 17020 (Accreditation No. 19221). That scope covers weld procedure qualification, welder qualification and witnessing to AS 1210, AS/NZS 1554, AS/NZS 3992, AS 4041, ASME IX and B31.3, AWS D1.1 and ISO 15614-1, among others. An auditor can check it on the NATA register.
Standards we qualify to
- Structural steel to the AS/NZS 1554 series and AWS D1.1
- Pressure equipment and piping to AS/NZS 3992, AS 4041, ASME IX and ASME B31.3
- Aluminium to AS/NZS 1665 and AWS D1.2
- Stainless steel structures to AWS D1.6
- ISO 15614-1 procedure qualification
- Project and class requirements, including DNV, LR and MIL-spec
What you send us
- The standard or specification the job is built to
- Parent material grades and thickness range
- Joint types and welding positions
- The welding process, and the consumable if your client has fixed one
- Any project requirements: impact testing, hardness limits, PWHT, third-party witnessing
Drawings help. If you are not sure what the job needs, send the specification and we will tell you.
What you get
- The WPS, written for the shop floor so welders can follow it and supervisors can check it
- The PQR with its mechanical test and NDT reports
- Material and consumable certificates
- A WPS register, updated free of charge each time you add a procedure
- Records kept on file, so we can resupply them years later
Turnaround
From our library: typically within 24 hours. We hold more than 3,250 qualified procedures, so most common combinations of material, process and position are already done.
New qualification: 3 to 5 business days where the procedure has to be welded and tested. We hold a broad range of materials and consumables and prepare coupons in house, which is what keeps that time short.
If a procedure test fails, we cover the re-test.
Materials and processes
- Carbon and low alloy steels
- Stainless steels
- Duplex and super duplex stainless steels
- Creep-resisting steels: P11, P22 and P91
- Aluminium
- Copper-nickel and Alloy 625
Procedures cover a range of thicknesses, positions, processes and consumables, set to suit your job rather than a generic template.
Questions clients ask
How quickly can I get a WPS?
If it is in our library, typically within 24 hours. If it has to be qualified, 3 to 5 business days.
What do you need from me to start?
The standard, the parent material and thickness, the joint and position, and the process. Send the specification if you have it and we will work out the rest.
Who signs the WPS, and is the test witnessed?
Our International Welding Engineer (IWE) reviews and signs every WPS we issue, and you sign the manufacturer approval. Procedure tests are witnessed under our NATA ISO/IEC 17020 accreditation.
Can I use a prequalified WPS instead of qualifying one?
Sometimes. AS/NZS 1554.1 deems a procedure prequalified when the joint preparation, the parent material and the consumables are all prequalified, and the preheat and workmanship comply with the standard. You still need a documented macro test. Self-shielded flux-cored wire mixed with other consumables is never prequalified. Outside those limits the procedure is qualified another way: usually a test piece, sometimes documented prior use. We will tell you which route your job needs before you spend money on coupons.
Can you review WPSs someone else has written?
Yes. We review existing WPS and PQR packages against the job’s standard and specification, and report what complies, what does not and what needs requalifying.
What happens if a procedure test fails?
We cover the re-test.
Proof in the field
“Graham has a huge in-depth knowledge of welding to Australian and international standards. He is my go-to man for weld procedures and inspections.”
Get a WPS you can use, and defend
If you need welding procedures that satisfy your client, your auditor and your welders, we will build the right one for your project. Procedures are run from our head office in Wingfield, South Australia, for clients across Australia and overseas.
Call 1300 00 WELD or request a quote.