Welding compliance, inspection and engineering for mine sites, process plant and the fabricators who supply them, from design through to through-life support.
- NATA Accreditation No. 19221
- ISO/IEC 17020 Type A inspection body
- ISO 9001:2015 certified
- International Welding Engineer sign-off
- Offices in SA and NSW. Working nationally and overseas.
Who We Work For
- Asset owners
- EPCMs
- Contractors and fabricators
We have worked at each of those levels, so we know what each one has to prove to the next.

Where we come in
New plant, shutdowns and through life.
New plant: procedures, welder qualifications and inspection for the fabrication, in your shop or at your supplier’s.
Shutdowns: the procedures and the qualified welders in place before the plant comes down.
Through life: repair of cracked structures, and fatigue life improvement so the repair lasts.
What we do
Procedures, Qualified Welders, Inspection and Repair.
Compliance
- Welding procedures (WPS)Library of 3,250 qualified procedures / Underwritten
- Welder qualificationsNATA endorsed reports
- Welding management systemsAS/NZS 5131 / AS/NZS ISO 3834
- InspectionWelding / Coating / Poly pipe
- Welding supervisionAS 2214.1
- Supplier quality managementSupplier audits / Source inspection
- Project document reviewITPs / Procedures / NDT reports / MDRs
Optimisation
Standards
What Mining Steelwork and Plant Is Built To.
- AS/NZS 1554Structural steel welding. Part 1 for steel structures, Part 4 for high strength quenched and tempered steels, Part 5 for structures under high fatigue loading.
- AS/NZS 5131Fabrication and erection of structural steelwork. The construction category, CC1 to CC4, sets the level of control.
- AS 4100 and AS 3990Steel structures, and the steelwork of mechanical equipment.
- AS 4324.1Mobile equipment for continuous handling of bulk materials: the design of its steel structures.
- AS 1210 and AS 4041Pressure vessels and pressure piping.
- AS/NZS 3992Welding and brazing qualification for pressure equipment.
- AS/NZS ISO 3834Quality requirements for fusion welding.
- Site SpecificationThe asset owner’s own welding specification, where it adds to the standards.
Guide to AS/NZS 1554 / Welding management systems, AS/NZS 5131 and ISO 3834
When the plant is down
The Procedure Is Usually Already on the Shelf.
Most WPSs come from our library of more than 3,250 qualified procedures, typically within 24 hours. New procedures are welded, witnessed and tested in 3 to 5 business days.
We underwrite our procedures. If one we run fails NDT or mechanical testing, we rerun it at our cost.
Kept Independent
- Whoever supervises a job never inspects it.
- Whoever trains a welder does not test them.
- Procedures we weld ourselves do not carry the NATA endorsement, but we follow the same process.
Who Does the Work
Our own team. Every technician and engineer is trade qualified, and the work is signed off by an International Welding Engineer.